在线中文有码无码,亚洲综合色在线,一级毛片在线观看免费,精品亚洲午夜久久久久91,成人国产 第一页

Product Center
產(chǎn)品中心
聯(lián)系我們

山東洪雨防水工程有限公司

聯(lián)系人:孔經(jīng)理

手機(jī):132-7531-6008

電話:0531- 87186527 / 8285668

郵箱:2908667081@qq.com

網(wǎng)址:www.shqmwater.cn

地址:山東省濟(jì)南市市中區(qū)愛都小學(xué)南

新聞資訊
水泥地面如何做好防水?
發(fā)布時間:2022-12-28 15:23:06     瀏覽次數(shù):523次

水磨石地面整體性能好,堅固、光滑、耐磨、美觀、易于清潔,但它施工復(fù)雜,無彈性,吸熱譬強(qiáng),常用享人流較大的交通空間和房間。對美觀要求稍高的建筑,可采用美術(shù)查磨石,即以白泵泥或彩色水泥為膠結(jié)料,摻入大理石石屑而制成。通過不同色彩、圖案來求得豐富的變化和令人滿意的藝術(shù)效果。水磨石樓地面與水泥砂漿地面一樣,在我國南部地區(qū)及濕度大的季節(jié)里易出現(xiàn)返潮現(xiàn)象,那么水泥地面應(yīng)該如何做好防水呢?
1、面層下的防水隔離層,應(yīng)經(jīng)蓄水試驗合格后,方可鋪設(shè)面層。施工面層時.應(yīng)防止對防水隔離層造成損傷,面層的坡度應(yīng)事先做出標(biāo)記,保證坡度設(shè)置正確。   
Waterproof barrier layer surface under test should be qualified by the water, before the laying of the surface layer. Construction of the surface layer. Should prevent damage to the waterproof barrier layer, the slope of the surface layer should first make a mark, to ensure that the slope is set correctly.  
2、使用水泥砂漿面層時,宜采用l:2配合比,應(yīng)嚴(yán)格控制水灰比,以用十硬性砂漿鋪設(shè)。鋪設(shè)后,用平板振動器或滾子壓實,以提高砂漿面層的密實度。
When using cement mortar surface layer, should adopt l: 2 mixing ratio, water-cement ratio should be strictly controlled in order to use ten hard mortar laying. After laying, with a plate shaker or roller compaction to improve the density of the surface layer of mortar.  
3、切實做好壓光工作,掌握好壓光最佳時間,以消除可能出現(xiàn)的細(xì)微裂縫,使面層達(dá)到平整、光潔、無裂縫。面層施工宜在門、窗(含玻璃)安裝后施工,避免穿堂風(fēng)勁吹造成地面面層裂縫。
Calendering earnestly work to master calender best time to eliminate minor cracks may appear, so the surface layer to achieve smooth, clean, no cracks. After surface construction should doors,windows (including glass) installation and construction, to avoid drafts blowing causing cracks in the ground surface. 
4、及時做好養(yǎng)護(hù)工作,宜采用蓄水養(yǎng)護(hù)或滿鋪濕潤材料后澆水養(yǎng)護(hù),為防止過早上人.將地面踩踏粗糙,養(yǎng)護(hù)期到后,應(yīng)做好地面保護(hù)工作,防止其他工種施工時,對地面造成損傷。
Maintenance work in a timely manner, should adopt the water conservation or water conservation paved moist material, to prevent premature Exalted. The stampede rough ground, after curing period,should do the ground work to protect against other types of construction, the damage on the ground. 

 

濟(jì)南防水公司http://www.tianyujian.com/